Taking
After

Partial taking from a gas station / convenience store

As part of the project for which a portion of this property was acquired, two of the property’s driveways were substantially altered. To accommodate a roundabout which was being constructed to replace the existing intersection, the two driveways were narrowed, moved further away from the intersection, and re-established in a skewed configuration within the functional limits of the roundabout. These changes resulted in the driveways no longer lining up correctly with the site’s fueling stations and negatively impacted vehicular circulation on site, especially for larger vehicles and vehicles pulling trailers, which formed a significant percentage of the site’s customer base. To partially restore site circulation, one of the site’s four pumps will need to be removed and the site’s canopy shifted north.

Initial Offer
$100,000
Final Recovery
$530,000
View All Results
Every case is different and results depend on their specific circumstances. Prior results do not guarantee a similar outcome.